← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · East Devon

Paytherden Solar Farm (Peradon)

Under Construction49 MWApplication 21/3120/MFULSubmitted 14 December 2021Granted 7 December 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
21/3120/MFUL
Planning authority
East Devon
County or area
Devon
Nation
England
Technology
Solar
Capacity
49 MW
Status
Under Construction
Operator or applicant
Lightrock Power Limited
Location
Adj Peradon Farm, Clyst Hydon, Cullompton, EX15 2NG
  • 14 December 2021 Planning application submitted
  • 1 September 2022 Construction started
  • 7 December 2022 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1486, Fire under solar panels at Broadclyst brought under control, 8.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14862026Fire under solar panels at Broadclyst brought under control8.4 kmSignificant
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow16 kmMajor
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage30 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near EX15 2NG is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Devon.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.