← Back to Devon

Solar · United Kingdom

Langford Solar Farm

Operator JBM Solar Projects · Owner Pp Asset Management Limited

Operational35 MWData checked 16 November 2026Source record dated 28 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Langford Solar Farm is a 35 MW solar farm 3.8 km south of Cullompton, Devon, United Kingdom. Its planning application (19/01679/MFUL) went to Mid Devon on 10 October 2019 and was granted on appeal on 5 December 2022. It has been operating since 2 July 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 268 energy sites within 40 km for Langford Solar Farm

Members see the sites and incidents around this one, and every record behind them.

JBM SOLAR PROJECTS LTD (10064549), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
35 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
JBM Solar Projects
Owner
Pp Asset Management Limited
Location
Land at NGR 303437 103555 East, Langford Mill and Tye Farm, Cullompton, Devon, Devon, EX15 1RE, United Kingdom
Planning authority
Mid Devon
Planning application
19/01679/MFUL
Appeal reference
APP/Y1138/W/22/3293104
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/01679/MFUL, with what the planning evidence pack adds for this site.

Every application in Mid Devon · Alerts for applications and incidents near here

  • 10 October 2019 Planning application submitted
  • 23 September 2021 Planning permission refused
  • 17 February 2022 Appeal lodged
  • 5 December 2022 Planning permission granted
  • 5 December 2022 Appeal granted
  • 2 July 2025 Operational

None found. The register holds no published incident that names Langford Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Langford Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Langford Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Langford Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2025.
Where is Langford Solar Farm?
3.8 km south of Cullompton, Devon, United Kingdom (postcode EX15 1RE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).