Planning application · Solar · East Devon
Future Industrial Services, Durham Way - Solar Panels
Awaiting Construction0.2 MWApplication 26/1432/PVJSubmitted 29 July 2026Granted 22 September 2026
The application
- Application number
- 26/1432/PVJ
- Planning authority
- East Devon
- County or area
- Devon
- Nation
- England
- Technology
- Solar
- Capacity
- 0.2 MW
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Augean Honiton
- Location
- Future Industrial Services Ltd Durham Way Heathpark Industrial Estate, EX14 1SQ
Timeline
- 29 July 2026 Planning application submitted
- 22 September 2026 Planning permission granted
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1468, Solar panels involved in fire that destroyed a Sidmouth bungalow, 13 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1468 | 2026 | Solar panels involved in fire that destroyed a Sidmouth bungalow | 13 km | Major |
| EIR-1486 | 2026 | Fire under solar panels at Broadclyst brought under control | 17 km | Significant |
| EIR-1526 | 2025 | Solar panels catch fire on a retail or public building roof in South Petherton | 33 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packWhat the planning evidence pack adds for this application
The pack is made for Future Industrial Services, Durham Way - Solar Panels from the register and the government planning database: every comparable incident, nearest first, with its sources; the schemes refused, withdrawn or taken to appeal within 40 km, your council first; and the fire service guidance each incident bears on. One fixed, dated file, as a PDF, a web page and a Word document.
- Incidents within 50 km
- •••
- Nearest recorded incident
- ••••••
- UK grid-scale incidents, with NFCC notes
- ••••
- Schemes refused within 40 km
- •••
- Nearest refused scheme
- ••••••••••••
- Appeals within 40 km
- •••
- Decisions in East Devon
- ••••••••
- Sites of a similar size, worldwide
- ••••
- NFCC guidance points
- ••••••••
- Sources and citations
- ••••••••••
£295. By email in minutes. The order form arrives filled in from this application.
Alerts for applications near here
An email when another battery, solar or wind application near EX14 1SQ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.
The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Devon.
Data updated 13 November 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.