Solar · United Kingdom

Future Industrial Services, Durham Way - Solar Panels

Operator Augean Honiton

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 7 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Future Industrial Services, Durham Way - Solar Panels is a 0.2 MW solar farm on the edge of Honiton, Devon, United Kingdom. Its planning application (26/1432/PVJ) went to East Devon on 29 July 2026 and was granted on 22 September 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Future Industrial Services, Durham Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1468, Solar panels involved in fire that destroyed a Sidmouth bungalow, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow13 kmMajor
EIR-14862026Fire under solar panels at Broadclyst brought under control17 kmSignificant
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton33 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Augean Honiton
Location
Future Industrial Services Ltd Durham Way Heathpark Industrial Estate, Devon, EX14 1SQ, United Kingdom
Planning authority
East Devon
Planning application
26/1432/PVJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/1432/PVJ, with what the planning evidence pack adds for this site.

Every application in East Devon · Alerts for applications and incidents near here

  • 29 July 2026 Planning application submitted
  • 22 September 2026 Planning permission granted

None found. The register holds no published incident that names Future Industrial Services, Durham Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Future Industrial Services, Durham Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Future Industrial Services, Durham Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Future Industrial Services, Durham Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2026.
Where is Future Industrial Services, Durham Way - Solar Panels?
On the edge of Honiton, Devon, United Kingdom (postcode EX14 1SQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).