Planning application · Solar · Bournemouth, Christchurch and Poole

Parley Court - Solar Farm

Awaiting Construction35 MWApplication 8/21/1067/FULSubmitted 19 November 2021Granted 18 June 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
8/21/1067/FUL
Planning authority
Bournemouth, Christchurch and Poole
County or area
Dorset
Nation
England
Technology
Solar
Capacity
35 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Enviromena Asset Management UK Limited
Location
Parley Green Parley Green Lane Bournemouth, BH23 6BB
  • 19 November 2021 Planning application submitted
  • 18 June 2024 Planning permission granted
  • 18 June 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1516, Solar panels suspected in house roof fire in Ferndown, 3.3 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15162025Solar panels suspected in house roof fire in Ferndown3.3 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown4.1 kmSignificant
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole7.2 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BH23 6BB is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Bournemouth, Christchurch and Poole.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.