← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Bedford

Nun Wood (Bedford)

Appeal Refused18 MWApplication 09/00137/MAFSubmitted 29 January 2009Refused on appeal 17 December 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
09/00137/MAF
Planning authority
Bedford
County or area
Bedfordshire
Nation
England
Technology
Onshore wind
Capacity
18 MW
Status
Appeal Refused
Operator or applicant
Npower Renewables
Location
Land West Of New Road (Nun Wood) Harrold Bedfordshire
Appeal reference
K0235/A/11/2149434
Turbines
6
  • 29 January 2009 Planning application submitted
  • 15 February 2011 Planning permission refused
  • 17 December 2013 Appeal refused

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1578, Wind turbine fire near Chumleigh in Devon, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15782024Wind turbine fire near Chumleigh in Devon42 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm44 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms57 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Nun Wood (Bedford) is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Bedford.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.