Planning application · Onshore wind · Broxtowe

Newthorpe Wind Turbine

Operational2.5 MWApplication 10/00717/FULSubmitted 3 December 2010Granted 15 July 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
10/00717/FUL
Planning authority
Broxtowe
County or area
Nottinghamshire
Nation
England
Technology
Onshore wind
Capacity
2.5 MW
Status
Operational
Operator or applicant
Severn Trent Water
Location
Sewage Treatment Works, Halls Lane, Giltbrook, Nottinghamshire, NG16 2DE
Turbines
1
First operating
2014
  • 3 December 2010 Planning application submitted
  • 15 July 2011 Planning permission granted
  • 23 April 2013 Construction started
  • 8 April 2014 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0732, Nordex turbine damaged by suspected lightning strike at UK wind farm, 80 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm80 kmMinor
EIR-20212022Wind turbine catches fire near Thorney in Lincolnshire90 kmSignificant
EIR-09232009Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure104 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NG16 2DE is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Broxtowe.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.