Planning application · Onshore wind · Swale

New Rides Wind Farm

Operational8.8 MWApplication SW/13/1571Submitted 27 January 2014Granted on appeal 9 August 2017

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
SW/13/1571
Planning authority
Swale
County or area
Kent
Nation
England
Technology
Onshore wind
Capacity
8.8 MW
Status
Operational
Operator or applicant
Airvolution Energy
Location
New Rides Farm, Leysdown Road, Sheerness, ME12 4DD
Appeal reference
APP/V2255/W/15/3014371
Turbines
4
First operating
2018
  • 27 January 2014 Planning application submitted
  • 3 February 2015 Planning permission refused
  • 25 June 2015 Appeal lodged
  • 9 August 2017 Planning permission granted
  • 9 August 2017 Appeal granted
  • 7 June 2018 Construction started
  • 1 December 2018 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1275, Fire damages Siemens Gamesa turbine at French Farm wind farm, 125 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm125 kmSignificant
EIR-15782024Wind turbine fire near Chumleigh in Devon125 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms134 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near ME12 4DD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Swale.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.