← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Cornwall

Nancrossa Farm solar park

Operational6 MWApplication PA14/04493Submitted 14 May 2014Granted on appeal 8 September 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
PA14/04493
Planning authority
Cornwall
Nation
England
Technology
Solar
Capacity
6 MW
Status
Operational
Operator or applicant
Second Solar Project
Location
Nancrossa Farm Rame Cross Penryn Cornwall, TR10 9EA
Appeal reference
APP/D0840/W/15/3002512
First operating
2016
  • 14 May 2014 Planning application submitted
  • 30 September 2014 Planning permission refused
  • 4 March 2015 Appeal lodged
  • 8 September 2015 Planning permission granted
  • 8 September 2015 Appeal granted
  • 5 January 2016 Construction started
  • 31 March 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1540, Fire in solar panel on house roof in Flushing, 8.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15402018Fire in solar panel on house roof in Flushing8.1 kmMinor
EIR-15432017Fire damages roof space and solar panels on bungalow in Crowan8.1 kmSignificant
EIR-15382020Solar panels blown off roof in storm at Newquay29 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near TR10 9EA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cornwall.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.