Solar · United Kingdom
Butteriss Solar Park
Operator Antigua Solar
Appeal Refused3 MWData checked 16 November 2026Source record dated 5 February 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Butteriss Solar Park is a 3 MW solar farm 7 km west of Penryn, Cornwall, United Kingdom. Its planning application (PA13/11664) went to Cornwall on 23 January 2014 and was refused on appeal on 28 January 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 17 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Butteriss Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- Antigua Solar
- Location
- Land Adjoining Butteriss Farm, Edgcumbe, Penryn, Cornwall, Cornwall, TR10 9EF, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA13/11664
- Appeal reference
- APP/D0840/A/14/2229290
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA13/11664, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 23 January 2014 Planning application submitted
- 30 June 2014 Planning permission refused
- 15 December 2014 Appeal lodged
- 28 January 2016 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Butteriss Solar Park. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Butteriss Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Butteriss Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Butteriss Solar Park?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 5 February 2016.
- Where is Butteriss Solar Park?
- 7 km west of Penryn, Cornwall, United Kingdom (postcode TR10 9EF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).