Planning application · Solar · Forest of Dean

Murrells End Farm - Solar Arrays

Application Refused49.9 MWApplication P0271/22/FULSubmitted 1 June 2022Refused 15 March 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P0271/22/FUL
Planning authority
Forest of Dean
County or area
Gloucestershire
Nation
England
Technology
Solar
Capacity
49.9 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Elgin Energy EsCo Limited
Location
The South Of Murrells End Farm Murrells End Hartpury, GL19 3DF
  • 1 June 2022 Planning application submitted
  • 15 March 2023 Planning permission refused

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries32 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire33 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near GL19 3DF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Forest of Dean.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.