← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Cherwell

Manor Farm, Noke - Solar Farm

Awaiting Construction45 MWApplication 22/01682/FSubmitted 7 June 2022Granted on appeal 16 September 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/01682/F
Planning authority
Cherwell
County or area
Oxfordshire
Nation
England
Technology
Solar
Capacity
45 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Green Nation
Location
Manor Farm, Noke, Oxford, OX33 9TX
  • 7 June 2022 Planning application submitted
  • 18 July 2024 Planning permission refused
  • 16 September 2025 Planning permission granted
  • 16 September 2025 Appeal granted
  • 16 September 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End44 kmMinor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire51 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries58 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near OX33 9TX is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cherwell.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.