Planning application · Solar · The Planning Inspectorate - National Infrastructure

Mallard Pass Solar Farm

Awaiting Construction350 MWApplication EN010127Submitted 24 November 2022Granted 12 July 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
EN010127
Planning authority
The Planning Inspectorate - National Infrastructure
County or area
Lincolnshire
Nation
England
Technology
Solar
Capacity
350 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Canadian Solar UK (Recurrent Energy ) / Windel Energy
Location
East Coast Main Line, Essendine, Stamford, PE9 4LP
  • 24 November 2022 Planning application submitted
  • 12 July 2024 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof19 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine31 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby36 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PE9 4LP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in The Planning Inspectorate - National Infrastructure.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.