Solar · United Kingdom

Mallard Pass Solar Farm

Operator Canadian Solar UK (Recurrent Energy ) & Windel Energy

Awaiting Construction350 MWData checked 16 November 2026Source record dated 10 March 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mallard Pass Solar Farm is a 350 MW solar farm 5.1 km north-east of Stamford, Lincolnshire, United Kingdom. Its planning application (EN010127) went to The Planning Inspectorate - National Infrastructure on 24 November 2022 and was granted on 12 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mallard Pass Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof19 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine31 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby36 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
350 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Canadian Solar UK (Recurrent Energy ) & Windel Energy
Location
East Coast Main Line, Essendine, Stamford, Lincolnshire, PE9 4LP, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010127

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010127, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 24 November 2022 Planning application submitted
  • 12 July 2024 Planning permission granted

None found. The register holds no published incident that names Mallard Pass Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Mallard Pass Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mallard Pass Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mallard Pass Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 March 2025.
Where is Mallard Pass Solar Farm?
5.1 km north-east of Stamford, Lincolnshire, United Kingdom (postcode PE9 4LP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).