Planning application · Solar · East Lindsey

Low Farm Solar Farm

Under Construction49.9 MWApplication S/195/02340/20Submitted 22 December 2020Granted 29 March 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
S/195/02340/20
Planning authority
East Lindsey
County or area
Lincolnshire
Nation
England
Technology
Solar
Capacity
49.9 MW
Status
Under Construction
Operator or applicant
Gresham House / Anesco Limited
Location
Low Farm, PE24 2LA
  • 22 December 2020 Planning application submitted
  • 29 March 2021 Planning permission granted
  • 28 March 2023 Construction started
  • 29 March 2025 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine38 kmMinor
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof65 kmSignificant
EIR-12652024Solar panels catch fire and destroy three buildings in Harby76 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PE24 2LA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Lindsey.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.