← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Dartford

Linhay Hill Quarry, Settling Pond - Solar Panel Array

Awaiting Construction0.5 MWApplication 0288/24Submitted 2 July 2024Granted 3 September 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
0288/24
Planning authority
Dartford
County or area
Devon
Nation
England
Technology
Solar
Capacity
0.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
E & JW Glendinning Limited
Location
Linhay Hill Quarry, Settling Pond, Ashburton, Newton Abbot, TQ13 7ES
  • 2 July 2024 Planning application submitted
  • 3 September 2024 Planning permission granted
  • 3 September 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1536, Inverter fire at a solar farm at East Langford, Kilkhampton, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15362020Inverter fire at a solar farm at East Langford, Kilkhampton13 kmMinor
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage17 kmMinor
EIR-15352022Fire involves roof and solar panels at a house under construction in Dittisham19 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near TQ13 7ES is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Dartford.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.