Ling Farm, Langtoft - Wind Turbines

Awaiting Construction0.5 MWApplication ZE25/01165/FULSubmitted 21 October 2025Granted 18 February 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
ZE25/01165/FUL
Planning authority
North Yorkshire
County or area
East Riding of Yorkshire
Nation
England
Technology
Onshore wind
Capacity
0.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
Ling Farm, Green Lane, Langtoft, Driffield, YO25 3BN
Turbines
2, 46 m to tip
  • 21 October 2025 Planning application submitted
  • 18 February 2026 Planning permission granted
  • 18 February 2029 Planning permission expired Date as recorded in the register

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1946, Wind turbine fire sends black smoke across Hull, 39 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19462022Wind turbine fire sends black smoke across Hull39 kmSignificant
EIR-18102022Wind turbine at Cargill Hull factory damaged by fire39 kmMajor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate70 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near YO25 3BN is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North Yorkshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.