Planning application · Solar · Brighton and Hove
Hove Polyclinic, Nevill Avenue - Solar Panels
Awaiting Construction0.2 MWApplication BH2024/02723Submitted 29 November 2024Granted 17 January 2025
The application
- Application number
- BH2024/02723
- Planning authority
- Brighton and Hove
- County or area
- East Sussex
- Nation
- England
- Technology
- Solar
- Capacity
- 0.2 MW
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Sussex Partnership NHS Foundation Trust
- Location
- Hove Polyclinic, Nevill Avenue, Hove, BN3 7HY
Timeline
- 29 November 2024 Planning application submitted
- 17 January 2025 Planning permission granted
Preview of the planning evidence pack for this site
The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1522, Fire damages roof with one solar panel in The Charltons, 5.9 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1522 | 2026 | Fire damages roof with one solar panel in The Charltons | 5.9 km | Minor |
| EIR-1527 | 2023 | Fire affects solar panels on nursing home roof in Woodingdean | 7.7 km | Minor |
| EIR-1303 | 2017 | Solar panel inverter fault destroys two Lewes homes | 14 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packWhat the planning evidence pack adds for this application
The pack is made for Hove Polyclinic, Nevill Avenue - Solar Panels from the register and the government planning database: every comparable incident, nearest first, with its sources; the schemes refused, withdrawn or taken to appeal within 40 km, your council first; and the fire service guidance each incident bears on. One fixed, dated file, as a PDF, a web page and a Word document.
- Incidents within 50 km
- •••
- Nearest recorded incident
- ••••••
- UK grid-scale incidents, with NFCC notes
- ••••
- Schemes refused within 40 km
- •••
- Nearest refused scheme
- ••••••••••••
- Appeals within 40 km
- •••
- Decisions in Brighton and Hove
- ••••••••
- Sites of a similar size, worldwide
- ••••
- NFCC guidance points
- ••••••••
- Sources and citations
- ••••••••••
Launch price: £145 until 31 October (normally £295). By email in minutes. The order form arrives filled in from this application.
Alerts for applications near here
An email when another battery, solar or wind application near BN3 7HY is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.
The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Brighton and Hove.
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.