Planning application · Solar · Hillingdon

Hillingdon Sports & Leisure Centre - Solar Panels

Awaiting Construction0.2 MWApplication 2543/APP/2023/2972Submitted 12 October 2023Granted 19 January 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2543/APP/2023/2972
Planning authority
Hillingdon
County or area
London
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ameresco Limited
Location
Hillingdon Sports And Leisure Centre, Gatting Way, Uxbridge, UB8 1ES
  • 12 October 2023 Planning application submitted
  • 19 January 2024 Planning permission granted
  • 19 January 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0774, Solar panel fire destroys roof of Ealing Council house in Greenford, 7.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford7.1 kmMajor
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley13 kmSignificant
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End17 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near UB8 1ES is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Hillingdon.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.