Planning application · Onshore wind · Orkney Islands
Hesta Head Wind Farm
Awaiting Construction20.4 MWApplication 17/083/TPPMAJSubmitted 6 March 2017Granted on appeal 18 April 2019
The application
- Application number
- 17/083/TPPMAJ
- Planning authority
- Orkney Islands
- Nation
- Scotland
- Technology
- Onshore wind
- Capacity
- 20.4 MW
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Hoolan Energy/ Hesta Head Wind Farm
- Location
- Hesta Head (Land Near), South Ronaldsay Windwick, Kirkwall, Orkney Isles, KW15 1HQ
- Appeal reference
- PPA-330-2023
- Turbines
- 5, 125 m to tip
Timeline
- 6 March 2017 Planning application submitted
- 21 September 2018 Planning permission refused
- 8 October 2018 Appeal lodged
- 18 April 2019 Planning permission granted
- 18 April 2019 Appeal granted
- 11 April 2027 Planning permission expired Date as recorded in the register
Preview of the planning evidence pack for this site
The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1291, Fatality at Viking wind farm site in Shetland Islands, 195 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1291 | 2022 | Fatality at Viking wind farm site in Shetland Islands | 195 km | Major |
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 225 km | Minor |
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 232 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packWhat the planning evidence pack adds for this application
The pack is made for Hesta Head Wind Farm from the register and the government planning database: every comparable incident, nearest first, with its sources; the schemes refused, withdrawn or taken to appeal within 40 km, your council first; and the fire service guidance each incident bears on. One fixed, dated file, as a PDF, a web page and a Word document.
- Incidents within 50 km
- •••
- Nearest recorded incident
- ••••••
- UK grid-scale incidents, with NFCC notes
- ••••
- Schemes refused within 40 km
- •••
- Nearest refused scheme
- ••••••••••••
- Appeals within 40 km
- •••
- Decisions in Orkney Islands
- ••••••••
- Sites of a similar size, worldwide
- ••••
- NFCC guidance points
- ••••••••
- Sources and citations
- ••••••••••
Launch price: £145 until 31 October (normally £295). By email in minutes. The order form arrives filled in from this application.
Alerts for applications near here
An email when another battery, solar or wind application near KW15 1HQ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.
The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Orkney Islands.
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.