Onshore wind · United Kingdom
New Holland, Stratheast Road -Wind Turbine
Operator New Holland Wind Llp
Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 4 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
New Holland, Stratheast Road -Wind Turbine is a 0.5 MW wind farm 8.5 km south of Kirkwall, Islands, United Kingdom. Its planning application (24/360/TPP) went to Orkney Islands on 16 September 2024 and was granted on 24 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 5 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when New Holland, Stratheast Road -Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for New Holland, Stratheast Road -Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2512, Fire at Viking Wind Farm construction site on Shetland, 181 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2512 | 2023 | Fire at Viking Wind Farm construction site on Shetland | 181 km | Minor |
| EIR-1291 | 2022 | Fatality at Viking wind farm site in Shetland Islands | 181 km | Major |
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 240 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- New Holland Wind Llp
- Location
- New Holland, Stratheast Road, Holm, Islands, KW17 2SA, United Kingdom
- Planning authority
- Orkney Islands
- Planning application
- 24/360/TPP
- Turbines
- 1, 49.5 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/360/TPP, with what the planning evidence pack adds for this site.
Every application in Orkney Islands · Alerts for applications and incidents near here
Timeline
- 16 September 2024 Planning application submitted
- 24 February 2025 Planning permission granted
- 23 February 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names New Holland, Stratheast Road -Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Questions
- Has New Holland, Stratheast Road -Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names New Holland, Stratheast Road -Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of New Holland, Stratheast Road -Wind Turbine?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2025.
- Where is New Holland, Stratheast Road -Wind Turbine?
- 8.5 km south of Kirkwall, Islands, United Kingdom (postcode KW17 2SA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).