Work Farm Wind Turbines is a 1.8 MW wind farm 3.1 km north-east of Kirkwall, Orkney Islands, United Kingdom. Its planning application (12/699/TPP) went to Orkney Islands on 12 October 2012 and was granted on 31 January 2013. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 6 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Work Farm Wind Turbines changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Work Farm Wind Turbines sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2512, Fire at Viking Wind Farm construction site on Shetland, 173 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2512 | 2023 | Fire at Viking Wind Farm construction site on Shetland | 173 km | Minor |
| EIR-1291 | 2022 | Fatality at Viking wind farm site in Shetland Islands | 173 km | Major |
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 249 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 1.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- S & JD Robertson Group Ltd
- Location
- Work Farm (Land Near), Work Road, St Ola, Orkney, Orkney Islands, KW17 2DX, United Kingdom
- Planning authority
- Orkney Islands
- Planning application
- 12/699/TPP
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/699/TPP, with what the planning evidence pack adds for this site.
Every application in Orkney Islands · Alerts for applications and incidents near here
Timeline
- 12 October 2012 Planning application submitted
- 31 January 2013 Planning permission granted
- 31 January 2016 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Work Farm Wind Turbines. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Work Farm Wind Turbines had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Work Farm Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Work Farm Wind Turbines?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 13 June 2023.
- Where is Work Farm Wind Turbines?
- 3.1 km north-east of Kirkwall, Orkney Islands, United Kingdom (postcode KW17 2DX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).