Onshore wind · United Kingdom
Hesta Head Wind Farm
Operator Hoolan Energy& Hesta Head Wind Farm
Awaiting Construction20.4 MWData checked 16 November 2026Source record dated 5 August 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hesta Head Wind Farm is a 20.4 MW wind farm 23 km south of Kirkwall, Orkney Islands, United Kingdom. Its planning application (17/083/TPPMAJ) went to Orkney Islands on 6 March 2017 and was granted on appeal on 18 April 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Hesta Head Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hesta Head Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2512, Fire at Viking Wind Farm construction site on Shetland, 195 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2512 | 2023 | Fire at Viking Wind Farm construction site on Shetland | 195 km | Minor |
| EIR-1291 | 2022 | Fatality at Viking wind farm site in Shetland Islands | 195 km | Major |
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 225 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 20.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Hoolan Energy& Hesta Head Wind Farm
- Location
- Hesta Head (Land Near), South Ronaldsay Windwick, Kirkwall, Orkney Isles, Orkney Islands, KW15 1HQ, United Kingdom
- Planning authority
- Orkney Islands
- Planning application
- 17/083/TPPMAJ
- Appeal reference
- PPA-330-2023
- Turbines
- 5, 125 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 17/083/TPPMAJ, with what the planning evidence pack adds for this site.
Every application in Orkney Islands · Alerts for applications and incidents near here
Timeline
- 6 March 2017 Planning application submitted
- 21 September 2018 Planning permission refused
- 8 October 2018 Appeal lodged
- 18 April 2019 Planning permission granted
- 18 April 2019 Appeal granted
- 11 April 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Hesta Head Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hesta Head Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hesta Head Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Hesta Head Wind Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2020.
- Where is Hesta Head Wind Farm?
- 23 km south of Kirkwall, Orkney Islands, United Kingdom (postcode KW15 1HQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).