Onshore wind · United Kingdom

Hesta Head Wind Farm

Operator Hoolan Energy& Hesta Head Wind Farm

Awaiting Construction20.4 MWData checked 16 November 2026Source record dated 5 August 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hesta Head Wind Farm is a 20.4 MW wind farm 23 km south of Kirkwall, Orkney Islands, United Kingdom. Its planning application (17/083/TPPMAJ) went to Orkney Islands on 6 March 2017 and was granted on appeal on 18 April 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hesta Head Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2512, Fire at Viking Wind Farm construction site on Shetland, 195 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25122023Fire at Viking Wind Farm construction site on Shetland195 kmMinor
EIR-12912022Fatality at Viking wind farm site in Shetland Islands195 kmMajor
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire225 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
20.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Hoolan Energy& Hesta Head Wind Farm
Location
Hesta Head (Land Near), South Ronaldsay Windwick, Kirkwall, Orkney Isles, Orkney Islands, KW15 1HQ, United Kingdom
Planning authority
Orkney Islands
Planning application
17/083/TPPMAJ
Appeal reference
PPA-330-2023
Turbines
5, 125 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 17/083/TPPMAJ, with what the planning evidence pack adds for this site.

Every application in Orkney Islands · Alerts for applications and incidents near here

  • 6 March 2017 Planning application submitted
  • 21 September 2018 Planning permission refused
  • 8 October 2018 Appeal lodged
  • 18 April 2019 Planning permission granted
  • 18 April 2019 Appeal granted
  • 11 April 2027 Planning permission runs out

None found. The register holds no published incident that names Hesta Head Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Hesta Head Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hesta Head Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hesta Head Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2020.
Where is Hesta Head Wind Farm?
23 km south of Kirkwall, Orkney Islands, United Kingdom (postcode KW15 1HQ).