← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · North Ayrshire

GlaxoSmithKline Wind Project (Turbine 4)

Operational2.5 MWApplication 12/00629/PPSubmitted 13 November 2012Granted 19 June 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
12/00629/PP
Planning authority
North Ayrshire
County or area
Strathclyde
Nation
Scotland
Technology
Onshore wind
Capacity
2.5 MW
Status
Operational
Operator or applicant
GlaxoSmithKline
Location
Shewalton Road Riverside Business Park Irvine Ayrshire
Turbines
1
First operating
2014
  • 13 November 2012 Planning application submitted
  • 19 June 2013 Planning permission granted
  • 1 January 2014 Construction started
  • 1 June 2014 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0922, Vestas turbine nacelle fire at Ardrossan wind farm during storm, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm13 kmSignificant
EIR-19512022Investigation begins after turbine fire at Ardrossan wind farm13 kmSignificant
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow24 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near GlaxoSmithKline Wind Project (Turbine 4) is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North Ayrshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.