Solar · United Kingdom
Glaxosmithkline Shewalton Road
Operator Glaxosmithkline · Owner Glaxo Group Limited
Under Construction19.9 MWData checked 17 November 2026Source record dated 28 March 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Glaxosmithkline Shewalton Road is a 19.9 MW solar farm 3.1 km south-east of Irvine, Ayrshire, United Kingdom. Its planning application (19/00163/PP) went to North Ayrshire on 14 March 2019 and was granted on 19 June 2019. Construction started on 4 October 2021. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 39 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Glaxosmithkline Shewalton Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
GLAXOSMITHKLINE LIMITED (12215835), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Glaxosmithkline Shewalton Road sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 90 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 90 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 118 km | Significant |
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 156 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 19.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Glaxosmithkline
- Owner
- Glaxo Group Limited
- Location
- Glaxosmithkline, Shewalton Road, Irvine, Strathclyde, Ayrshire, KA11 5AP, United Kingdom
- Planning authority
- North Ayrshire
- Planning application
- 19/00163/PP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/00163/PP, with what the planning evidence pack adds for this site.
Every application in North Ayrshire · Alerts for applications and incidents near here
Timeline
- 14 March 2019 Planning application submitted
- 19 June 2019 Planning permission granted
- 4 October 2021 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Glaxosmithkline Shewalton Road. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Glaxosmithkline Shewalton Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Glaxosmithkline Shewalton Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Glaxosmithkline Shewalton Road?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 March 2023.
- Where is Glaxosmithkline Shewalton Road?
- 3.1 km south-east of Irvine, Ayrshire, United Kingdom (postcode KA11 5AP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).