Planning application · Solar · Torridge

Gammaton Moor Solar farm

Operational32 MWApplication 1/1057/2021/FULMSubmitted 1 September 2021Granted 19 April 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
1/1057/2021/FULM
Planning authority
Torridge
County or area
Devon
Nation
England
Technology
Solar
Capacity
32 MW
Status
Operational
Operator or applicant
Sonnedix
Location
Webbery Barton & Cleave Farm, EX39 4QZ
First operating
2026
  • 1 September 2021 Planning application submitted
  • 19 April 2022 Planning permission granted
  • 1 April 2026 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 40 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop40 kmSignificant
EIR-14862026Fire under solar panels at Broadclyst brought under control56 kmSignificant
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage67 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near EX39 4QZ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Torridge.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.