Planning application · Solar · East Devon

Ford Oaks Solar & Green Infrastructure Facility

Under Construction30 MWApplication 22/0990/MFULSubmitted 19 May 2022Granted on appeal 30 November 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/0990/MFUL
Planning authority
East Devon
County or area
Devon
Nation
England
Technology
Solar
Capacity
30 MW
Status
Under Construction
Operator or applicant
Low Carbon Alliance / Taiyo Power & Storage
Location
Marsh Green Farm Marsh Green, Exeter, EX5 2EU
Appeal reference
APP/U1105/W/23/3320714
  • 19 May 2022 Planning application submitted
  • 12 January 2023 Planning permission refused
  • 20 April 2023 Appeal lodged
  • 30 November 2023 Planning permission granted
  • 30 November 2023 Appeal granted
  • 1 October 2025 Construction started
  • 30 November 2026 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1486, Fire under solar panels at Broadclyst brought under control, 6.9 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14862026Fire under solar panels at Broadclyst brought under control6.9 kmSignificant
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow10 kmMajor
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage22 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near EX5 2EU is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Devon.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.