Planning application · Solar · Braintree

Cutbush Farm, Belchamp St Paul - Solar Array

Under Construction50 MWApplication 23/01413/FULSubmitted 31 May 2023Granted 9 December 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/01413/FUL
Planning authority
Braintree
County or area
Suffolk
Nation
England
Technology
Solar
Capacity
50 MW
Status
Under Construction
Operator or applicant
British Solar Renewables
Location
Land North Of Cutbush Farm Bakers Road Belchamp St Paul, CO10 7DF
  • 31 May 2023 Planning application submitted
  • 9 December 2024 Planning permission granted
  • 1 September 2025 Construction started
  • 9 December 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2223, Homeowners allege solar panel fault caused Tolleshunt Knights house fire, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire32 kmMajor
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium36 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers46 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CO10 7DF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Braintree.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.