Corley Smorral Lane - Photovoltaic Solar Arrays

Awaiting Construction16.5 MWApplication PAP/2021/0605Submitted 18 November 2021Granted 27 July 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
PAP/2021/0605
Planning authority
North Warwickshire
County or area
West Midlands
Nation
England
Technology
Solar
Capacity
16.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Barrs Family Enterprises Limited
Location
350 metres NW/O Marlwood Bungalow & Land E/O Breach Oak Lane, Corley Smorral Lane Astley Fillongley, Coventry, CV7 8AT
  • 18 November 2021 Planning application submitted
  • 27 July 2022 Planning permission granted
  • 27 July 2025 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college21 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge38 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property41 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CV7 8AT is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North Warwickshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.