Unit 13, Central Boulevard - Solar photovoltaics is a 0.2 MW solar farm 4.6 km south-west of Bedworth, West Midlands, United Kingdom. Its planning application (PL/2023/0001898/PAPV) went to Coventry on 6 September 2023 and was granted on 8 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 75 other energy sites within 10 km, 48 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Unit 13, Central Boulevard - Solar photovoltaics sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college22 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge38 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property39 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Winvic Construction Limited
Location
Unit 13, Central Boulevard, Coventry, West Midlands, CV6 4BX, United Kingdom
Planning authority
Coventry
Planning application
PL/2023/0001898/PAPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2023/0001898/PAPV, with what the planning evidence pack adds for this site.

Every application in Coventry · Alerts for applications and incidents near here

  • 6 September 2023 Planning application submitted
  • 8 November 2023 Planning permission granted

None found. The register holds no published incident that names Unit 13, Central Boulevard - Solar photovoltaics. If you know of one, report it (confidential reports are anonymised).

Has Unit 13, Central Boulevard - Solar photovoltaics had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Unit 13, Central Boulevard - Solar photovoltaics; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Unit 13, Central Boulevard - Solar photovoltaics?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 November 2023.
Where is Unit 13, Central Boulevard - Solar photovoltaics?
4.6 km south-west of Bedworth, West Midlands, United Kingdom (postcode CV6 4BX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).