Planning application · Solar · County Durham

Chester-Le-Street Community Hospital - Solar Panels

Awaiting Construction0.2 MWApplication DM/25/03417/PN56Submitted 8 December 2025Granted 9 February 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DM/25/03417/PN56
Planning authority
County Durham
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
County Durham & Darlington NHS Foundation Trust
Location
County Durham And Darlington Nhs Foundation Trust, Chester-Le-Street Community Hospital Front Street, Chester Le Street, DH3 3AT
  • 8 December 2025 Planning application submitted
  • 9 February 2026 Planning permission granted
  • 9 February 2029 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre25 kmMinor
EIR-14992025Solar panels linked to fires at council buildings in Northumberland26 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton94 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DH3 3AT is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in County Durham.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.