← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Newham

Bywaters’ Materials Recovery Facility Solar Array

Operational1 MWApplication 15/02981/PREPVSubmitted 19 October 2015Granted 18 December 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
15/02981/PREPV
Planning authority
Newham
County or area
London
Nation
England
Technology
Solar
Capacity
1 MW
Status
Operational
Operator or applicant
Bywaters
Location
Unit J Prologis Park Twelvetrees Crescent Bromley By Bow London E3 3JG, E3 3JG
First operating
2017
  • 19 October 2015 Planning application submitted
  • 18 December 2015 Planning permission granted
  • 24 December 2016 Construction started
  • 24 January 2017 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 6.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London6.7 kmSignificant
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected15 kmMinor
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel15 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near E3 3JG is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Newham.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.