← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Battery storage · Hertsmere

Butterfly Lane, Elstree BESS - Battery Energy Storage System

Appeal Lodged99.9 MWApplication 25/1070/FULSubmitted 18 July 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
25/1070/FUL
Planning authority
Hertsmere
County or area
Hertfordshire
Nation
England
Technology
Battery storage (Stand-alone Storage)
Capacity
99.9 MW
Status
Appeal Lodged
Operator or applicant
Greenfield Energy Developments Limited
Location
Opp Jnct With Butterfly Lane, E/O Watling Street, Radlett, WD7 7AB
Appeal reference
26/0016/APP
  • 18 July 2025 Planning application submitted
  • 31 March 2026 Appeal lodged

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 55 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction55 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire111 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cells169 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near WD7 7AB is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Hertsmere.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.