Solar · United Kingdom
Bell Lane Solar Farm
Operator Mulbrick Cleans Energy
Application Refused1 MWData checked 16 November 2026Source record dated 2 December 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bell Lane Solar Farm is a 1 MW solar farm on the edge of London Colney, Hertfordshire, United Kingdom. Its planning application (15/1287/FUL) went to Hertsmere on 27 August 2015 and was refused on 26 November 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 63 other energy sites within 10 km, 46 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bell Lane Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Mulbrick Cleans Energy
- Location
- Land At Bell Lane And Opposite, Bell Lane, Shenley, Radlett, Hertfordshire, WD7 9AD, United Kingdom
- Planning authority
- Hertsmere
- Planning application
- 15/1287/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/1287/FUL, with what the planning evidence pack adds for this site.
Every application in Hertsmere · Alerts for applications and incidents near here
Timeline
- 27 August 2015 Planning application submitted
- 26 November 2015 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Bell Lane Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bell Lane Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bell Lane Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bell Lane Solar Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2015.
- Where is Bell Lane Solar Farm?
- On the edge of London Colney, Hertfordshire, United Kingdom (postcode WD7 9AD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).