Planning application · Onshore wind · Argyll and Bute

Bridge House, Muasdale, Tarbert, Strathclyde

Revised47.6 MWApplication 16/01313/PPSubmitted 18 May 2016Granted on appeal 18 December 2019

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
16/01313/PP
Planning authority
Argyll and Bute
Nation
Scotland
Technology
Onshore wind
Capacity
47.6 MW
Status
Revised
Operator or applicant
E.ON UK
Location
Bridge House, Muasdale, Tarbert, Strathclyde, PA29 6XD
Appeal reference
PPA-130-2064
Turbines
14, 127 m to tip
  • 18 May 2016 Planning application submitted
  • 21 September 2017 Planning permission refused
  • 20 December 2017 Appeal lodged
  • 18 December 2019 Planning permission granted
  • 18 December 2019 Appeal granted
  • 18 December 2024 Planning permission expired

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1951, Investigation begins after turbine fire at Ardrossan wind farm, 51 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19512022Investigation begins after turbine fire at Ardrossan wind farm51 kmSignificant
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm72 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire78 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PA29 6XD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Argyll and Bute.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.