← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Nottingham

Boots Campus - Roof Top Solar Farm

Awaiting Construction6.3 MWApplication 22/01231/PFUL3Submitted 21 June 2022Granted 5 December 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/01231/PFUL3
Planning authority
Nottingham
County or area
Nottinghamshire
Nation
England
Technology
Solar
Capacity
6.3 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Boots Company Plc
Location
Boots Campus, D90 Building Head Office Thane Road Nottingham Nottingham City, NG90 1BS
  • 21 June 2022 Planning application submitted
  • 5 December 2022 Planning permission granted
  • 5 December 2025 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby20 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge33 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property51 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NG90 1BS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Nottingham.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.