Planning application · Solar · Swale

Bobbing solar farm

Operational11.3 MWApplication SW/14/0525Submitted 6 May 2014Granted on appeal 7 December 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
SW/14/0525
Planning authority
Swale
County or area
Kent
Nation
England
Technology
Solar
Capacity
11.3 MW
Status
Operational
Operator or applicant
Solar Securities (Group)
Location
Cold Harbour Lane, Bobbing, Sittingbourne, Kent, ME9 8NN
Appeal reference
APP/V2255/W/15/3017938
First operating
2016
  • 6 May 2014 Planning application submitted
  • 20 October 2014 Planning permission refused
  • 22 June 2015 Appeal lodged
  • 7 December 2015 Planning permission granted
  • 7 December 2015 Appeal granted
  • 31 January 2016 Construction started
  • 31 March 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house30 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers32 kmMinor
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet46 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near ME9 8NN is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Swale.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.