← Back to Kent

Solar · United Kingdom

Orchard Farm

Operator Omega Solar & OPDE

Operational10 MWData checked 16 November 2026Source record dated 16 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Orchard Farm is a 10 MW solar farm 3.9 km north-west of Sittingbourne, Kent, United Kingdom. Its planning application (14/502072/FULL) went to Swale on 7 August 2014 and was granted on 22 October 2014. It has been operating since 2 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

491 energy sites within 40 km for Orchard Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Omega Solar & OPDE
Location
W/O Orchard Farm, School Lane, Iwade, Sittingbourne, Kent, Kent, ME9 8QG, United Kingdom
Planning authority
Swale
Planning application
14/502072/FULL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/502072/FULL, with what the planning evidence pack adds for this site.

Every application in Swale · Alerts for applications and incidents near here

  • 7 August 2014 Planning application submitted
  • 22 October 2014 Planning permission granted
  • 5 October 2015 Construction started
  • 2 February 2016 Operational

None found. The register holds no published incident that names Orchard Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Orchard Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Orchard Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Orchard Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 March 2016.
Where is Orchard Farm?
3.9 km north-west of Sittingbourne, Kent, United Kingdom (postcode ME9 8QG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).