Lightning strike triggers cascading outage at Cúcuta's Belén substation
Nov 2026Published 26 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in Colombia, and an email when EIR-3052 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Centrales Eléctricas del Norte de Santander, National Transmission
What happened
On Monday 23 November 2026, an atmospheric discharge (lightning) recorded at 3:53 pm triggered a cascading disconnection on the electricity network serving San José de Cúcuta and its metropolitan area in Norte de Santander, Colombia. The fault at the Belén substation also affected the San Mateo substation, which was already operating with reduced capacity because of scheduled works on the National Transmission System due to run until 29 November. Large parts of Cúcuta and the surrounding area lost supply from the afternoon into the night.
According to the utility, Centrales Eléctricas del Norte de Santander (CENS, Grupo EPM), full service was restored at 11:10 pm. The utility published an official technical report describing the fault and recovery manoeuvres in seven key moments. CENS apologised to the community and said the system was operating normally, with backup conditions maintained until 29 November.
Contributing factors
Atmospheric discharge (lightning) recorded at 3:53 pm. The San Mateo substation was operating with reduced capacity because of scheduled works on the National Transmission System, with those works due to run until 29 November. The source does not give further technical detail on the equipment that tripped.
Lessons learned
- Substations should be checked for lightning protection and surge withstand so that a single strike does not trip interconnected substations in sequence.
- Operators running reduced-capacity or maintenance configurations should reassess their contingency margins before forecast severe weather.
- Restoration timelines and the sequence of recovery steps should be communicated to affected customers while the outage is still under way.
More lessons on weather and external hazards, outages, backup supply and restoration, from every incident on the register.
Source
Published 2026-11-26. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.