Cattenom unit 1 islanded after connection box fault on 400kV line
Nov 2026Published 25 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in France, and an email when EIR-3043 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
On 6 November 2026, a fault on a 400,000-volt line at the Cattenom nuclear plant in north-eastern France cut Unit 1, a 1,300 MW pressurised water reactor, off from the national grid at about 6:20 a.m. local time. EDF later traced the fault to a connection box where the high-voltage line connects to Unit 1, and said it needs replacing. Unit 1 islanded, powering only its own safety-related systems, and EDF crews later shut it down by hand, with the shutdown scheduled for 8 November.
Unit 3, already offline for scheduled maintenance, shared the same line and lost its remaining external power source, so its emergency diesel generators started and supplied power to its safety equipment. Those diesels ran longer than the time allowed by the plant's Technical Specifications. On 13 November, EDF declared a significant safety event at level 1 on the International Nuclear Event Scale to the French nuclear regulator, the ASNR. Units 2 and 4 were fed by a separate line, and Unit 2 kept running.
Contributing factors
The fault originated in a connection box on the 400,000-volt line serving Unit 1. Unit 3 was already shut down for maintenance, so it had only one external power source left, and the fault removed that as well. Unit 4 was also in maintenance, which left Unit 2 as the only reactor supplying the grid that morning. The rating of the event followed from the emergency diesels running beyond the time limit in the plant's operating rules. EDF has not published the duration of the diesel run or the limit itself.
Lessons learned
- Where a plant has several units on one grid connection, a single fault can remove the external power supply of more than one unit at once, so the status of every unit on that line should be checked when planning maintenance.
- Maintenance outages that leave a unit with only one external power source should be assessed for the loss of that source, and the time limits for emergency diesel operation should be monitored in real time against the operating rules.
- Where a unit is islanded or shut down by hand, operators should record clear times for each stage and publish the limits that apply, so that the significance of any deviation can be judged and understood.
More lessons on electrical protection and isolation, detection and monitoring, from every incident on the register.
Source
Published 2026-11-25. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.