RTE transformer failure under heatwave cuts power to households in Finistère
June 2026Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- Ergué-Gabéric near Quimper in Finistère
- Operator
- RTE
- What
- Transformer failed cutting power to 106000 customers
- Injuries
- None reported
- Cause
- Accidental failure linked to intense heat
Get the next one by email
Free alerts on grid infrastructure incidents in France, and an email when EIR-0247 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
A transformer operated by RTE, France's electricity transmission system operator, failed on Tuesday evening at around 9 p.m. at Ergué-Gabéric, a commune near Quimper in Finistère. The failure cut power to up to 106,000 customers. By Wednesday morning, approximately 68,000 households in southwestern Finistère remained without electricity. The Finistère prefecture attributed the incident to an accidental failure linked to intense heat, as the region was under a red heatwave alert with Météo-France issuing red alerts for 58 departments nationally.
RTE and Enedis teams worked overnight on securing and restoring supply, with full restoration not expected before the end of the day. Care homes for dependent elderly residents affected by the outage were provided with backup generators. No casualties were reported.
Contributing factors
Extreme heat reduced the transmission capacity of electrical equipment and increased network operating constraints, according to the Finistère prefecture and national meteorological alerts.
Lessons learned
- Operators should review transformer cooling and load limits ahead of heatwaves, as extreme heat reduced capacity and caused the failure at Ergué-Gabéric.
- Transmission and distribution teams must coordinate overnight restoration plans, as supply to 68000 households remained off the next morning.
- Care homes need pre-positioned generators during extended outages, as backup units were supplied after the heat-related failure.
More lessons on weather and external hazards, outages, backup supply and restoration, from every incident on the register.
Not yet known
- Transformer model and age
- Exact duration of the outage
- Cost of repairs and lost supply
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Published 2026-09-07. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.