Cable fire reported at TNB substation
2023Published 25 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in Malaysia, and an email when EIR-3037 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
New Straits Times reported on 5 July 2023 that an electric cable at a TNB substation had caught fire. Only the headline and a feed summary were available for this entry. The location, the date of the fire, the equipment affected, any outage, damage or injuries are not reported in the material reviewed.
Contributing factors
Not reported in the source reviewed.
Lessons learned
- Cable terminations and joints at substations can overheat, so operators should keep temperature monitoring and inspection of them under regular review.
- Reports based only on a headline should be checked against fuller accounts before any cause or consequence is recorded.
- Operators should record fire events at grid assets with date, location, equipment and outage details so that later reviews can establish what happened.
More lessons on detection and monitoring, outages, backup supply and restoration, from every incident on the register.
Source
Published 2026-11-25. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.