An explosion occurred at approximately 09:00 on 13 May 2024 at the Hercules Street Substation in Herlear, Kimberley. Four Sol Plaatje municipal workers were injured while attending to a cable fault. One worker sustained severe burn wounds and remained in critical condition; the other three were reported out of danger. Power was fully restored after faulty cables were repaired and a new ring main unit installed. The Department of Labour attended the site to assess the incident.

Faulty cables were identified as the cause of the explosion.

  1. A cable fault being worked on in a substation can escalate to an explosion that injures several people on site.
  2. Confirm the circuit state and the fault location before staff work on a reported cable fault.
  3. After such an explosion, repair or replace damaged equipment, including the ring main unit, before restoring supply, and preserve the scene for the labour authority.

More lessons on electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.

Published 2026-09-29. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Grid infrastructure incidents in South Africa, by year, free with a credit (PNG).

Grid infrastructure incidents in South Africa: 158 entries, with a free alert for the next one.

Substation and transformer fires: the counts, the latest entries and a free alert for the next one. Also: power line and cable failures.

Browse the full register or submit an incident.