Fire reported at NGCP Hermosa substation in Bataan
Aug 2024Published 29 Sept 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in the Philippines, and an email when EIR-1588 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): National Grid Corp. of the Philippines
What happened
The National Grid Corp. of the Philippines (NGCP) said a fire broke out at its substation in Barangay Balsik, Hermosa, Bataan, at 4:40 p.m. on 3 August 2024. Initial reports indicated that a DICT contractor struck a 69 kV line owned and operated by Peninsula Electric Cooperative (Penelco) outside the facility, and that the cut conductor landed on a non-technical structure inside the substation and started the fire. The fire affected NGCP's Hermosa-Calaguiman 69 kV line, which serves three generation plants in Bataan.
NGCP said transmission services to distribution customers were not interrupted. Police reported that the fire, at a warehouse of the substation, was declared out at 6:51 p.m. and that three construction workers were injured. Separately, Penelco said an unscheduled interruption in Dinalupihan and the Hermosa Ecozone followed accidental contact by a truck with the Hermosa-Dinalupihan line in Balsik, and that a fire in the same area affected a segment of that line.
Contributing factors
NGCP's initial account attributed the substation fire to external contact that cut a 69 kV conductor, which then fell onto a structure inside the site. Penelco separately reported accidental truck contact with a distribution line in the same area. The link between the two accounts has not been confirmed.
Lessons learned
- Work beside live overhead lines needs enforced clearance controls for vehicles and contractors.
- A conductor cut outside a substation boundary can still start a fire inside the site if it falls onto structures.
- Transmission and distribution operators should share timely information when an external contact and a fire affect lines in the same area.
More lessons on worker safety and safe systems of work, from every incident on the register.
Source
Published 2026-09-29. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.