Wind turbine collapses at Point Tupper Wind Farm after hub bearing fault, Nova Scotia
Aug 2016Published 15 Sept 2026Responsible editor: Chief Editor
- Where
- Point Tupper Wind Farm, Point Tupper, Nova Scotia
- Operator
- Renewable Energy Services
- What
- 80 metre wind turbine collapsed after blades struck tower
- Injuries
- None reported
- Manufacturer
- Enercon Canada
Get the next one by email
Free alerts on wind (onshore) incidents in Canada, and an email when EIR-0852 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Enercon Canada, Renewable Energy Services
What happened
An 80-metre wind turbine at the Point Tupper Wind Farm in Point Tupper, Nova Scotia, operated by Renewable Energy Services, collapsed on 17 August 2016 after its blades struck the tower, bending it before it buckled at the midpoint and fell to the ground. The turbine's hub had suffered a bearing failure months earlier and had recently been repaired, with the hub replaced and blades reattached. During a lightning-protection system test, a technician heard an unusual noise, suspected to be a forgotten washer inside the hub, and on inspection found the blades were incorrectly pitched and the electromechanical brake had not engaged.
Workers were instructed to leave the turbine and move to a safe distance. Around four hours later, with no one present, the tower collapsed. No injuries, fires or explosions occurred, and the wider power grid was unaffected. A provincial stop-work order was issued and lifted four months later once the manufacturer, Enercon Canada, had responded to regulatory queries.
Contributing factors
A prior bearing failure in the hub required replacement and blade reattachment; technical challenges were encountered during this repair; the electromechanical brake was not applied and the blades were left pitched incorrectly (about 2 degrees instead of 90 degrees) during a lightning-protection test, which appears to have led to the structural failure.
Lessons learned
- After hub bearing repair and blade reattachment, operators must verify correct blade pitch and brake engagement before any test run.
- An unusual noise during a lightning protection test on a repaired hub should trigger immediate shutdown and inspection rather than continued operation.
- Evacuation to a safe distance after detecting incorrect blade pitch prevents injury when tower collapse follows.
More lessons on structural integrity and turbines, weather and external hazards, from every incident on the register.
Not yet known
- Turbine model and age
- Cost of the damage
- Duration of downtime
This entry is updated when these are reported. Get an alert for the next one like it.