← Back to the list
Wind (onshore)CanadaEIR-0852

Wind turbine collapses at Point Tupper Wind Farm after hub bearing fault, Nova Scotia

Aug 2016Published 15 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
turbine out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Point Tupper Wind Farm, Point Tupper, Nova Scotia
Operator
Renewable Energy Services
What
80 metre wind turbine collapsed after blades struck tower
Injuries
None reported
Manufacturer
Enercon Canada

Companies named in the reporting of this entry (being named is not a finding of fault): Enercon Canada, Renewable Energy Services

An 80-metre wind turbine at the Point Tupper Wind Farm in Point Tupper, Nova Scotia, operated by Renewable Energy Services, collapsed on 17 August 2016 after its blades struck the tower, bending it before it buckled at the midpoint and fell to the ground. The turbine's hub had suffered a bearing failure months earlier and had recently been repaired, with the hub replaced and blades reattached. During a lightning-protection system test, a technician heard an unusual noise, suspected to be a forgotten washer inside the hub, and on inspection found the blades were incorrectly pitched and the electromechanical brake had not engaged.

Workers were instructed to leave the turbine and move to a safe distance. Around four hours later, with no one present, the tower collapsed. No injuries, fires or explosions occurred, and the wider power grid was unaffected. A provincial stop-work order was issued and lifted four months later once the manufacturer, Enercon Canada, had responded to regulatory queries.

A prior bearing failure in the hub required replacement and blade reattachment; technical challenges were encountered during this repair; the electromechanical brake was not applied and the blades were left pitched incorrectly (about 2 degrees instead of 90 degrees) during a lightning-protection test, which appears to have led to the structural failure.

  1. After hub bearing repair and blade reattachment, operators must verify correct blade pitch and brake engagement before any test run.
  2. An unusual noise during a lightning protection test on a repaired hub should trigger immediate shutdown and inspection rather than continued operation.
  3. Evacuation to a safe distance after detecting incorrect blade pitch prevents injury when tower collapse follows.

More lessons on structural integrity and turbines, weather and external hazards, from every incident on the register.

  • Turbine model and age
  • Cost of the damage
  • Duration of downtime

This entry is updated when these are reported. Get an alert for the next one like it.

Site page: Point Tupper (status, dates and other incidents)

Published 2026-09-15. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Wind (onshore) incidents in Canada, by year, free with a credit (PNG).

Wind (onshore) incidents in Canada: 23 entries, with a free alert for the next one.

Wind turbine fires: the counts, the latest entries and a free alert for the next one. Also: wind turbine blade failures and wind turbine collapses.

Browse the full register or submit an incident.