Blade failure on Mingyang prototype at Lingao test centre
Dec 2024Published 15 Sept 2026Responsible editor: Chief Editor
- Where
- Lingao test centre, Hainan, China
- Operator
- Mingyang Smart Energy
- What
- Blades fractured on wind turbine prototype
- Injuries
- None reported
- Cause
- Under investigation
Get the next one by email
Free alerts on wind (onshore) incidents in China, and an email when EIR-0751 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Mingyang
What happened
Mingyang Smart Energy said that blades fractured on a newly developed wind turbine prototype being tested at its large wind turbine test centre in Lingao, Hainan, China. The company said the turbine was under extreme-condition testing, that the blades met abnormal conditions beyond their design load limit, and that no one at the test site was harmed. It said the product was still in testing and had not been marketed or mass-produced. Reports in China, cited by Offshore Wind, said two blades failed on 6 December 2024 on a MySE18.X-20MW prototype. Mingyang did not specify which prototype was involved.
Contributing factors
Mingyang's preliminary conclusion was that extreme, abnormal conditions during the test caused the blades to exceed their design load limit. A final cause has not been published.
Lessons learned
- Extreme-load testing of prototypes must stop loads before they exceed design limits, as abnormal conditions caused blade fracture.
- Operators should analyse fracture data from a test before any model enters commercial production.
- Test sites need a defined emergency response plan even when no one is hurt.
More lessons on structural integrity and turbines, emergency response and public communication, from every incident on the register.
Not yet known
- Final published cause of the failure
- Exact prototype model and age
- Cost of the damage and downtime
This entry is updated when these are reported. Get an alert for the next one like it.
Published 2026-09-15. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.