Fire and transformer explosion at GRIDCo substation cuts power to Obuasi
May 2025Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- GRIDCo substation in Ashanti Region, Ghana
- Operator
- Ghana Grid Company Limited (GRIDCo)
- What
- Fire and transformer explosion caused power outage
- Response
- Firefighters brought blaze under control
- Outcome
- Power supply remained disrupted during restoration
Get the next one by email
Free alerts on grid infrastructure incidents in Ghana, and an email when EIR-0486 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Ghana Grid, GRIDCo
What happened
A fire broke out at a Ghana Grid Company Limited (GRIDCo) substation supplying electricity to Obuasi and surrounding communities in the Ashanti Region. The fire led to the explosion of a transformer, causing a major power outage across the affected area. The incident occurred on Wednesday, 21 May 2025. Firefighters attended the scene and brought the blaze under control. Following the fire, GRIDCo engineers began assessing the extent of the damage to substation equipment before restoring supply.
GRIDCo issued a public apology for the inconvenience caused and stated that its engineering team was carrying out checks to confirm the integrity of equipment at the station prior to reconnecting customers. As of the report, power supply to Obuasi and neighbouring communities remained disrupted while restoration work continued.
Lessons learned
- Substation transformers need fire barriers, as a fire led to the explosion of a transformer.
- Engineers must check substation equipment integrity after fire before reconnection.
More lessons on spacing, layout and fire spread, from every incident on the register.
Not yet known
- Cause of the fire
- Transformer model and age
- Duration of the outage
- Cost of the damage
This entry is updated when these are reported. Get an alert for the next one like it.