Grid infrastructureIndiaEIR-0469

Transformer explosion at Rengpang Substation cuts power across Tamenglong District

June 2025Published 7 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
supply cut for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Rengpang control room, Tamenglong district, Manipur
Operator
Manipur power department
What
Sole 3.15 MVA transformer exploded twice
Injuries
None reported
Outcome
Prolonged outage across multiple substations

Companies named in the reporting of this entry (being named is not a finding of fault): Manipur power department

The sole 3.15 MVA, 33/11 kV transformer at the Rengpang control room in Tamenglong district, Manipur, tripped with a loud explosion at around 4:17 PM on a Sunday, causing extensive damage to the 11kV incomer panel. A follow-up attempt to recharge the system the next day, after panel installation work, failed when the transformer exploded again around midday. The control panel was completely burnt in the incident. The failure caused a prolonged power outage affecting the 132/33 kV substation at Rengpang and 33/11 kV substations at Tamenglong, Tousem and Khoupum.

A replacement transformer was being arranged from Imphal by the Manipur power department, with officials estimating up to five days for it to arrive and be installed. No injuries were reported.

The site relied on a single transformer with no redundancy, so its failure caused a complete outage across multiple downstream substations. A second explosion occurred during recharging after panel repair work, suggesting the underlying fault may not have been fully resolved before re-energising the system.

  1. A single 33/11 kV transformer with no redundancy leaves multiple downstream substations without supply after one failure.
  2. Re-energising a transformer after the first explosion without resolving the root fault led to a second blast.
  3. Remote sites need pre-positioned spares, as arranging a replacement from Imphal takes up to five days.

More lessons on outages, backup supply and restoration, design, standards and commissioning, maintenance, inspection and ageing assets, from every incident on the register.

  • Exact cause of the explosions
  • Transformer model and age
  • Cost of damage and repairs

This entry is updated when these are reported. Get an alert for the next one like it.

Published 2026-09-07. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Grid infrastructure incidents in India, by year, free with a credit (PNG).

Grid infrastructure incidents in India: 86 entries, with a free alert for the next one.

Substation and transformer fires: the counts, the latest entries and a free alert for the next one. Also: transformer explosions.

Browse the full register or submit an incident.