← Back to Gwynedd

Onshore wind · United Kingdom

Ystgellog Farm Wind Farm

Operator Airvolution Energy · Owner The Government Of Ireland

Operational4.6 MWData checked 16 November 2026Source record dated 10 May 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ystgellog Farm Wind Farm is a 4.6 MW wind farm 18 km north-east of Holyhead, Gwynedd, United Kingdom. Its planning application (11C557B) went to Isle of Anglesey on 24 October 2010 and was granted on 21 June 2011. It has been operating since 30 April 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 29 other sites and 35 energy sites within 40 km for Ystgellog Farm Wind Farm

Members see the sites and incidents around this one, and every record behind them.

AIRVOLUTION ENERGY LIMITED (07070240), dissolved, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
4.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Airvolution Energy
Owner
The Government Of Ireland
Location
Ysgellog Farm, Rhosgoch, Builth Wells, Powys, LD2, Gwynedd, United Kingdom
Planning authority
Isle of Anglesey
Planning application
11C557B
First operating
2013
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11C557B, with what the planning evidence pack adds for this site.

Every application in Isle of Anglesey · Alerts for applications and incidents near here

  • 24 October 2010 Planning application submitted
  • 21 June 2011 Planning permission granted
  • 5 October 2012 Construction started
  • 30 April 2013 Operational

None found. The register holds no published incident that names Ystgellog Farm Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ystgellog Farm Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ystgellog Farm Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ystgellog Farm Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 May 2013.
Where is Ystgellog Farm Wind Farm?
18 km north-east of Holyhead, Gwynedd, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).