Around this site

← Back to Xinjiang

Solar · China

Xinjiang Lop (State Power Investment) 400 MW solar farm

Operational400 MWChecked 8 October 2026Last changed in the dataset 23 January 2024

Technology
Solar
Capacity
400 MW
Status
Operational (Operating)
Owner
Xinjiang Boyuan Energy Development Co Ltd; Hami Shengkun New Energy Co Ltd; Jinghe Xinhua New Energy Co Ltd; Bole Municipality New Energy Co Ltd; Silk Road Luopu New Energy Co Ltd; China Power Investm
Location
Pulu Town, Hotan Prefecture, Xinjiang, China
First operating
2024

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Lop (State Power Investment) 400 MW solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.